Build R11-5230(64bit): cannot complete paralelly (2jobs)

Bug report and feature request
Post Reply
kawamoto76
Advanced
Advanced
Posts: 480
Joined: Sun Dec 14, 2008 4:52 pm
Location: JAPAN

Build R11-5230(64bit): cannot complete paralelly (2jobs)

Post by kawamoto76 » Sun Mar 11, 2012 5:09 am

Although R11-5230 can convert each HD-TS(1920x1080,mpeg2/aac) into .m2ts(H.264/ac3) when they are processed as 1-job indevidually, it cannot convert two TSs pararelly as 2-job. There, only one TS can be processed completely.
The details had been explained in viewtopic.php?f=28&t=11357.
With R11-5230, the bad behaviour is the same as before.
Akira Kawamoto

stanley
Site Admin
Site Admin
Posts: 4135
Joined: Mon May 15, 2006 7:43 pm
Location: Sydney

Re: Build R11-5230(64bit): cannot complete paralelly (2jobs)

Post by stanley » Tue Mar 13, 2012 6:27 am

You are right. There is no fix for this yet. Please wait for MediaCoder 2012 (hopefully to be released within year 2012) which has complete new design of paralell tasking.
When things work together, things work.

kawamoto76
Advanced
Advanced
Posts: 480
Joined: Sun Dec 14, 2008 4:52 pm
Location: JAPAN

Re: Build R11-5230(64bit): cannot complete paralelly (2jobs)

Post by kawamoto76 » Wed May 23, 2012 4:24 am

This bug seems to be fixed at build 0.8.12.5245.
I will continue to test for more cases.
Akira Kawamoto

kawamoto76
Advanced
Advanced
Posts: 480
Joined: Sun Dec 14, 2008 4:52 pm
Location: JAPAN

Re: Build R11-5230(64bit): cannot complete paralelly (2jobs)

Post by kawamoto76 » Wed May 23, 2012 8:58 am

Sorry!
Tough I suceeded 2job parallely once, I found that this bug is still continuing at at build 0.8.12.5245.
Akira Kawamoto

Post Reply